ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ
(ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ ᱠᱷᱚᱱ ᱟᱹᱪᱩᱨ ᱦᱮᱡᱠᱟᱱᱟ)
ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ ᱫᱚ ᱵᱟᱝᱞᱟᱫᱮᱥ ᱨᱮᱭᱟᱜ ᱯᱚᱫᱽᱫᱟ ᱜᱟᱰᱟ ᱪᱮᱛᱟᱱ ᱵᱮᱱᱟᱣ ᱢᱤᱫ ᱥᱚᱲᱚᱠ ᱟᱨ ᱨᱮᱞ ᱥᱟᱠᱳ ᱠᱟᱱᱟ᱾ ᱱᱚᱣᱟ ᱫᱚ ᱵᱟᱝᱞᱟᱫᱮᱥ ᱨᱮᱭᱟᱜ ᱥᱚᱨᱤᱭᱚᱛᱯᱩᱨ ᱦᱚᱱᱚᱛ ᱥᱟᱶ ᱢᱟᱫᱟᱨᱤᱯᱩᱨ ᱦᱚᱱᱚᱛ ᱮ ᱡᱚᱲᱟᱣᱮᱫ ᱠᱟᱱᱟ᱾ ᱱᱚᱣᱟ ᱥᱟᱠᱳ ᱦᱚᱛᱮᱛᱮ ᱫᱤᱥᱚᱢ ᱨᱮᱭᱟᱜ ᱮᱛᱚᱢᱼᱯᱟᱪᱷᱮ ᱴᱚᱴᱷᱟ, ᱠᱚᱧᱮ ᱟᱨ ᱥᱟᱢᱟᱝ ᱴᱟᱴᱷᱟ ᱥᱟᱶᱛᱮ ᱡᱚᱲᱟᱣᱚᱜ ᱠᱟᱱᱟ᱾ ᱒᱕ ᱡᱩᱱ ᱒᱐᱒᱒ ᱢᱟᱹᱦᱤᱛ ᱨᱮ ᱱᱚᱣᱟ ᱥᱟᱠᱳ ᱩᱰᱟᱹᱣ ᱥᱟᱹᱜᱩᱱ ᱨᱮᱭᱟᱜ ᱠᱟᱛᱷᱟ ᱢᱮᱱᱟᱜᱼᱟ᱾[᱒] ᱵᱟᱨ ᱛᱚᱞᱟ ᱨᱮᱭᱟᱜ ᱥᱴᱤᱞ ᱟᱨ ᱠᱚᱝᱠᱨᱤᱴ ᱛᱮ ᱵᱮᱱᱟᱣ ᱴᱨᱟᱥᱴ ᱨᱮᱭᱟᱜ ᱱᱚᱣᱟ ᱥᱟᱠᱳ ᱨᱮᱭᱟᱜ ᱪᱮᱛᱟᱱ ᱨᱮᱫᱚ ᱯᱩᱱ ᱞᱮᱱ ᱨᱮᱭᱟᱜ ᱥᱚᱲᱚᱠ ᱟᱨ ᱞᱟᱛᱟᱨ ᱛᱚᱞᱟ ᱨᱮᱫᱚ ᱢᱤᱫ ᱞᱟᱭᱤᱱ ᱨᱮᱭᱟᱜ ᱨᱮᱞ ᱰᱟᱦᱟᱨ ᱢᱮᱱᱟᱜᱼᱟ᱾[᱔] ᱥᱟᱠᱳ ᱫᱚ ᱯᱚᱫᱽᱫᱟ ᱜᱟᱰᱟ ᱪᱮᱛᱟᱱ ᱔᱒ ᱜᱚᱴᱟᱱ ᱯᱤᱞᱟᱨ ᱟᱨ ᱑᱕᱐ ᱢᱤᱴᱟᱨ ᱞᱤᱡᱤᱧ ᱔᱑ ᱜᱚᱴᱟᱱ ᱥᱯᱮᱱ ᱛᱮ ᱜᱩᱴ ᱖.᱑᱕᱐ ᱠᱤᱢᱤ (᱓.᱘᱒᱑ ᱢᱟᱭᱤᱞ) ᱡᱤᱞᱤᱧ ᱟᱨ ᱒᱒.᱕ ᱢᱤᱴᱟᱨ (᱗᱔ ᱯᱷᱩᱴ) ᱚᱥᱟᱨᱟ᱾[᱕] ᱱᱚᱣᱟ ᱫᱚ ᱵᱟᱝᱞᱟᱫᱮᱥ ᱟᱨ ᱜᱟᱝᱱᱟᱹᱭ ᱪᱮᱛᱟᱱ ᱵᱮᱱᱟᱣ ᱟᱠᱟᱱ ᱥᱟᱱᱟᱢ ᱠᱷᱚᱱ ᱡᱤᱞᱤᱧ ᱥᱟᱠᱳ ᱠᱟᱱᱟ᱾
ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ পদ্মা সেতু | |
---|---|
Coordinates | 23°26′39″N 90°15′40″E / 23.4443°N 90.261°ECoordinates: 23°26′39″N 90°15′40″E / 23.4443°N 90.261°E |
ᱤᱫᱤᱭᱟ | ᱢᱚᱴᱚᱨ ᱜᱟᱹᱰᱤ, ᱨᱮᱞ ᱜᱟᱹᱰᱤ |
ᱟᱹᱢᱟᱹᱞᱮᱛ ᱧᱩᱛᱩᱢ | ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ |
Owner | ᱵᱟᱝᱞᱟᱫᱮᱥ ᱥᱚᱨᱠᱟᱨ |
Website | www |
Characteristics | |
ᱰᱤᱡᱮᱱ | ᱴᱨᱟᱥᱴ ᱥᱟᱠᱳ |
ᱜᱩᱴ ᱡᱤᱞᱤᱝ | ᱖,᱑᱕᱐ ᱢᱤ (᱒᱐,᱑᱘᱐ ᱯᱷᱩᱴ) |
ᱚᱥᱟᱨ | ᱑᱘.᱑᱘ ᱢᱤᱴᱟᱨ |
ᱩᱥᱩᱞ | ᱑᱒᱐ ᱢᱤᱴᱟᱨ (᱓᱙᱔ ᱯᱷᱩᱴ) |
Water depth | 122 m (400 ft)[᱑] |
ᱥᱯᱮᱱ ᱮᱞ | ᱔᱑ |
Load limit | ᱑᱐,᱐᱐᱐ ᱴᱚᱱ[᱑] |
No. of lanes | ᱔ |
History | |
Designer | AECOM |
ᱤᱫᱤ ᱛᱮ ᱵᱮᱱᱟᱣ ᱟᱠᱟᱱᱟ | ᱪᱟᱭᱱᱟ ᱢᱮᱡᱚᱨ ᱵᱨᱤᱡᱽ ᱤᱧᱡᱤᱱᱤᱭᱚᱨᱤᱝ ᱠᱚᱱᱥᱴᱨᱟᱠᱥᱚᱱ ᱠᱚᱢᱯᱟᱱᱤ ᱞᱤᱢᱤᱴᱮᱰ |
ᱵᱮᱱᱟᱣ ᱮᱦᱚᱵ | ᱒᱖ ᱱᱚᱵᱷᱮᱢᱵᱚᱨ ᱒᱐᱑᱔ |
ᱵᱮᱱᱟᱣ ᱢᱩᱪᱟᱹᱫ | ᱒᱒ ᱡᱩᱱ ᱒᱐᱒᱒[᱒] |
ᱮᱦᱚᱵ ᱮᱱᱟ | ৳30193.39 crore ({{BDTConvert/Expression error: ᱵᱟᱝ ᱧᱮᱞ ᱴᱷᱤᱠᱚᱜᱠᱟᱱ ᱪᱤᱱᱦᱟᱹ ᱠᱚ "[".|30193.39|7||USD|year={{{year}}}}}) (2018 estimates)[᱓] |
ᱮᱦᱚᱵ ᱮᱱᱟ | ᱒᱕ ᱡᱩᱱ ᱒᱐᱒᱒BST) | 10:00 (
ᱩᱰᱟᱹᱣ ᱥᱟᱹᱜᱩᱱ | ᱒᱕ ᱡᱩᱱ ᱒᱐᱒᱒ |
Statistics | |
Toll | Yes |
ᱱᱟᱜᱟᱢ
ᱥᱟᱯᱲᱟᱣᱵᱮᱱᱟᱣ ᱠᱟᱹᱢᱤᱦᱚᱨᱟ
ᱥᱟᱯᱲᱟᱣᱪᱤᱛᱟᱹᱨ
ᱥᱟᱯᱲᱟᱣ-
᱒᱐᱑᱙ ᱥᱮᱨᱢᱟ ᱨᱮ ᱵᱮᱱᱟᱣᱚᱜ ᱠᱟᱱ ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ
-
᱒᱐᱑᱙ ᱥᱮᱨᱢᱟ ᱨᱮ ᱵᱮᱱᱟᱣᱚᱜ ᱠᱟᱱ ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ
-
᱒᱐᱒᱐ ᱥᱮᱨᱢᱟ ᱨᱮ ᱵᱮᱱᱟᱣᱚᱜ ᱠᱟᱱ ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ
-
᱒᱐᱑᱙ ᱥᱮᱨᱢᱟ ᱨᱮ ᱵᱮᱱᱟᱣᱚᱜ ᱠᱟᱱ ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ
-
᱒᱐᱑᱙ ᱥᱮᱨᱢᱟ ᱨᱮᱭᱟᱜ ᱥᱮᱯᱴᱮᱢᱵᱚᱨ ᱨᱮ ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ
-
᱒᱐᱒᱒ ᱥᱮᱨᱢᱟ ᱨᱮ ᱵᱮᱱᱟᱣ ᱥᱟᱹᱛ ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ
ᱵᱟᱨᱦᱮ ᱡᱚᱱᱚᱲ
ᱥᱟᱯᱲᱟᱣᱥᱟᱹᱠᱷᱭᱟᱹᱛ
ᱥᱟᱯᱲᱟᱣ- ↑ ᱑.᱐ ᱑.᱑ "Padma bridge: কলকাতা থেকে ঢাকা আরও সাড়ে তিন ঘণ্টা সময় কমছে, জুনে খুলে যাচ্ছে পদ্মা সেতু". www.anandabazar.com. Retrieved 27 May 2022.
- ↑ ᱒.᱐ ᱒.᱑ "Padma Bridge likely to open to traffic by June 2022". Dhaka Tribune. 10 December 2020. Retrieved 27 May 2022.
- ↑ "How Padma Bridge cost surged to Tk30,000cr". The Business Standard (in ᱟᱝᱜᱽᱨᱮᱡᱤ). 12 December 2020. Retrieved 27 May 2022.
- ↑ Sultana Munima (14 October 2014). "Korean co gets Pawdda bridge supervision work". The Financial Express. Dhaka. Retrieved 11 November 2014.
- ↑ "Padma Multipurpose Bridge Project, Volume II: Environmental Assessment". World Bank. 6 September 2010. Retrieved 15 April 2021.