ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ
ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ ᱫᱚ ᱵᱟᱝᱞᱟᱫᱮᱥ ᱨᱮᱭᱟᱜ ᱯᱚᱫᱽᱫᱟ ᱜᱟᱰᱟ ᱪᱮᱛᱟᱱ ᱵᱮᱱᱟᱣ ᱢᱤᱫ ᱥᱚᱲᱚᱠ ᱟᱨ ᱨᱮᱞ ᱥᱟᱠᱳ ᱠᱟᱱᱟ᱾ ᱱᱚᱣᱟ ᱫᱚ ᱵᱟᱝᱞᱟᱫᱮᱥ ᱨᱮᱭᱟᱜ ᱥᱚᱨᱤᱭᱚᱛᱯᱩᱨ ᱦᱚᱱᱚᱛ ᱥᱟᱶ ᱢᱟᱫᱟᱨᱤᱯᱩᱨ ᱦᱚᱱᱚᱛ ᱮ ᱡᱚᱲᱟᱣᱮᱫ ᱠᱟᱱᱟ᱾ ᱱᱚᱣᱟ ᱥᱟᱠᱳ ᱦᱚᱛᱮᱛᱮ ᱫᱤᱥᱚᱢ ᱨᱮᱭᱟᱜ ᱮᱛᱚᱢᱼᱯᱟᱪᱷᱮ ᱴᱚᱴᱷᱟ, ᱠᱚᱧᱮ ᱟᱨ ᱥᱟᱢᱟᱝ ᱴᱟᱴᱷᱟ ᱥᱟᱶᱛᱮ ᱡᱚᱲᱟᱣᱚᱜ ᱠᱟᱱᱟ᱾ ᱒᱕ ᱡᱩᱱ ᱒᱐᱒᱒ ᱢᱟᱹᱦᱤᱛ ᱨᱮ ᱱᱚᱣᱟ ᱥᱟᱠᱳ ᱩᱰᱟᱹᱣ ᱥᱟᱹᱜᱩᱱ ᱨᱮᱭᱟᱜ ᱠᱟᱛᱷᱟ ᱢᱮᱱᱟᱜᱼᱟ᱾[᱒] ᱵᱟᱨ ᱛᱚᱞᱟ ᱨᱮᱭᱟᱜ ᱥᱴᱤᱞ ᱟᱨ ᱠᱚᱝᱠᱨᱤᱴ ᱛᱮ ᱵᱮᱱᱟᱣ ᱴᱨᱟᱥᱴ ᱨᱮᱭᱟᱜ ᱱᱚᱣᱟ ᱥᱟᱠᱳ ᱨᱮᱭᱟᱜ ᱪᱮᱛᱟᱱ ᱨᱮᱫᱚ ᱯᱩᱱ ᱞᱮᱱ ᱨᱮᱭᱟᱜ ᱥᱚᱲᱚᱠ ᱟᱨ ᱞᱟᱛᱟᱨ ᱛᱚᱞᱟ ᱨᱮᱫᱚ ᱢᱤᱫ ᱞᱟᱭᱤᱱ ᱨᱮᱭᱟᱜ ᱨᱮᱞ ᱰᱟᱦᱟᱨ ᱢᱮᱱᱟᱜᱼᱟ᱾[᱔] ᱥᱟᱠᱳ ᱫᱚ ᱯᱚᱫᱽᱫᱟ ᱜᱟᱰᱟ ᱪᱮᱛᱟᱱ ᱔᱒ ᱜᱚᱴᱟᱱ ᱯᱤᱞᱟᱨ ᱟᱨ ᱑᱕᱐ ᱢᱤᱴᱟᱨ ᱞᱤᱡᱤᱧ ᱔᱑ ᱜᱚᱴᱟᱱ ᱥᱯᱮᱱ ᱛᱮ ᱜᱩᱴ ᱖.᱑᱕᱐ ᱠᱤᱢᱤ (᱓.᱘᱒᱑ ᱢᱟᱭᱤᱞ) ᱡᱤᱞᱤᱧ ᱟᱨ ᱒᱒.᱕ ᱢᱤᱴᱟᱨ (᱗᱔ ᱯᱷᱩᱴ) ᱚᱥᱟᱨᱟ᱾[᱕] ᱱᱚᱣᱟ ᱫᱚ ᱵᱟᱝᱞᱟᱫᱮᱥ ᱟᱨ ᱜᱟᱝᱱᱟᱹᱭ ᱪᱮᱛᱟᱱ ᱵᱮᱱᱟᱣ ᱟᱠᱟᱱ ᱥᱟᱱᱟᱢ ᱠᱷᱚᱱ ᱡᱤᱞᱤᱧ ᱥᱟᱠᱳ ᱠᱟᱱᱟ᱾
ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ পদ্মা সেতু | |
---|---|
Coordinates | 23°26′39″N 90°15′40″E / 23.4443°N 90.261°ECoordinates: 23°26′39″N 90°15′40″E / 23.4443°N 90.261°E |
ᱤᱫᱤᱭᱟ | ᱢᱚᱴᱚᱨ ᱜᱟᱹᱰᱤ, ᱨᱮᱞ ᱜᱟᱹᱰᱤ |
ᱟᱹᱢᱟᱹᱞᱮᱛ ᱧᱩᱛᱩᱢ | ᱯᱚᱫᱽᱫᱟ ᱥᱟᱠᱳ |
Owner | ᱵᱟᱝᱞᱟᱫᱮᱥ ᱥᱚᱨᱠᱟᱨ |
Website | www |
Characteristics | |
ᱰᱤᱡᱮᱱ | ᱴᱨᱟᱥᱴ ᱥᱟᱠᱳ |
ᱜᱩᱴ ᱡᱤᱞᱤᱝ | ᱖,᱑᱕᱐ ᱢᱤ (᱒᱐,᱑᱘᱐ ᱯᱷᱩᱴ) |
ᱚᱥᱟᱨ | ᱑᱘.᱑᱘ ᱢᱤᱴᱟᱨ |
ᱩᱥᱩᱞ | ᱑᱒᱐ ᱢᱤᱴᱟᱨ (᱓᱙᱔ ᱯᱷᱩᱴ) |
Water depth | 122 m (400 ft)[᱑] |
ᱥᱯᱮᱱ ᱮᱞ | ᱔᱑ |
Load limit | ᱑᱐,᱐᱐᱐ ᱴᱚᱱ[᱑] |
No. of lanes | ᱔ |
History | |
Designer | AECOM |
ᱤᱫᱤ ᱛᱮ ᱵᱮᱱᱟᱣ ᱟᱠᱟᱱᱟ | ᱪᱟᱭᱱᱟ ᱢᱮᱡᱚᱨ ᱵᱨᱤᱡᱽ ᱤᱧᱡᱤᱱᱤᱭᱚᱨᱤᱝ ᱠᱚᱱᱥᱴᱨᱟᱠᱥᱚᱱ ᱠᱚᱢᱯᱟᱱᱤ ᱞᱤᱢᱤᱴᱮᱰ |
ᱵᱮᱱᱟᱣ ᱮᱦᱚᱵ | ᱒᱖ ᱱᱚᱵᱷᱮᱢᱵᱚᱨ ᱒᱐᱑᱔ |
ᱵᱮᱱᱟᱣ ᱢᱩᱪᱟᱹᱫ | ᱒᱒ ᱡᱩᱱ ᱒᱐᱒᱒[᱒] |
ᱮᱦᱚᱵ ᱮᱱᱟ | ৳30193.39 crore ({{BDTConvert/Expression error: ᱵᱟᱝ ᱧᱮᱞ ᱴᱷᱤᱠᱚᱜᱠᱟᱱ ᱪᱤᱱᱦᱟᱹ ᱠᱚ "[".|30193.39|7||USD|year={{{year}}}}}) (2018 estimates)[᱓] |
ᱮᱦᱚᱵ ᱮᱱᱟ | ᱒᱕ ᱡᱩᱱ ᱒᱐᱒᱒BST) | 10:00 (
ᱩᱰᱟᱹᱣ ᱥᱟᱹᱜᱩᱱ | ᱒᱕ ᱡᱩᱱ ᱒᱐᱒᱒ |
Statistics | |
Toll | Yes |
ᱱᱟᱜᱟᱢ
ᱥᱟᱯᱲᱟᱣᱵᱮᱱᱟᱣ ᱠᱟᱹᱢᱤᱦᱚᱨᱟ
ᱥᱟᱯᱲᱟᱣᱪᱤᱛᱟᱹᱨ
ᱥᱟᱯᱲᱟᱣ-
᱒᱐᱑᱙ ᱥᱮᱨᱢᱟ ᱨᱮ ᱵᱮᱱᱟᱣᱚᱜ ᱠᱟᱱ ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ
-
᱒᱐᱑᱙ ᱥᱮᱨᱢᱟ ᱨᱮ ᱵᱮᱱᱟᱣᱚᱜ ᱠᱟᱱ ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ
-
᱒᱐᱒᱐ ᱥᱮᱨᱢᱟ ᱨᱮ ᱵᱮᱱᱟᱣᱚᱜ ᱠᱟᱱ ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ
-
᱒᱐᱑᱙ ᱥᱮᱨᱢᱟ ᱨᱮ ᱵᱮᱱᱟᱣᱚᱜ ᱠᱟᱱ ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ
-
᱒᱐᱑᱙ ᱥᱮᱨᱢᱟ ᱨᱮᱭᱟᱜ ᱥᱮᱯᱴᱮᱢᱵᱚᱨ ᱨᱮ ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ
-
᱒᱐᱒᱒ ᱥᱮᱨᱢᱟ ᱨᱮ ᱵᱮᱱᱟᱣ ᱥᱟᱹᱛ ᱯᱚᱫᱫᱟ ᱥᱟᱠᱳ
ᱵᱟᱨᱦᱮ ᱡᱚᱱᱚᱲ
ᱥᱟᱯᱲᱟᱣᱥᱟᱹᱠᱷᱭᱟᱹᱛ
ᱥᱟᱯᱲᱟᱣ- ↑ ᱑.᱐ ᱑.᱑ "Padma bridge: কলকাতা থেকে ঢাকা আরও সাড়ে তিন ঘণ্টা সময় কমছে, জুনে খুলে যাচ্ছে পদ্মা সেতু". www.anandabazar.com. Retrieved 27 May 2022.
- ↑ ᱒.᱐ ᱒.᱑ "Padma Bridge likely to open to traffic by June 2022". Dhaka Tribune. 10 December 2020. Retrieved 27 May 2022.
- ↑ "How Padma Bridge cost surged to Tk30,000cr". The Business Standard (in ᱟᱝᱜᱽᱨᱮᱡᱤ). 12 December 2020. Retrieved 27 May 2022.
- ↑ Sultana Munima (14 October 2014). "Korean co gets Pawdda bridge supervision work". The Financial Express. Dhaka. Retrieved 11 November 2014.
- ↑ "Padma Multipurpose Bridge Project, Volume II: Environmental Assessment". World Bank. 6 September 2010. Retrieved 15 April 2021.